If you are struggling with seismic reinforcement of steel structures, contact Senkushia for total support.
From on-site surveys to seismic assessments and reinforcement work, we provide consistent support. With our original construction methods, we propose safe and reliable seismic reinforcement in a short construction period.
Are your factory and warehouse earthquake measures in place? Do you have any of the following concerns? - I want to conduct a seismic assessment, but I don't know who to ask. - I am considering BCP measures. - I want to take effective measures without incurring too much cost. - I don't want to stop operations due to reinforcement work. At Senkushia, we provide consistent support from on-site surveys, seismic assessments, seismic reinforcement design to seismic reinforcement construction. Utilizing the technology and know-how we have developed so far, we propose safe and secure seismic reinforcements while continuing the operations of factories and warehouses. 【Senkushia's Original "Steel Frame Seismic Reinforcement System"】 <Smart Attach Method> As a non-welding method, it eliminates the need for fire protection work at the construction site, shortens the construction period, and reduces total costs. <Smart Fit Method> Compared to conventional methods, the height dimensions of the reinforcement materials are smaller, allowing for compact reinforcement and minimizing interference with production lines. <Smart Chronos II Method> By eliminating welding, it reduces fire risks and contributes to total cost reduction through shortened construction periods. *For more details on other features, please refer to the PDF materials or feel free to contact us.
- Company:センクシア 東京支店、札幌支店、東北支店、関東支店、北陸支店、中部支店、関西支店、中四国支店、九州支店
- Price:Other